Marine Link
Wednesday, October 14, 2026

Leaky Ballast Line Disables Ship

Maritime Activity Reports, Inc.

April 1, 2005

The Australian Transport Safety Board (ATSB) released its investigation into the engineroom flooding on the bulk carrier HARMONIC PROGRESS in the Coral Sea on April 16, 2004. Leaks in valves in the ballast line resulted in the main ballast line being pressurized, causing it to discharge and flood the engineroom. The crew was new, the ship having recently changed owners, and the handover was found to be inadequate. As a result, the personnel were unable to quickly find and correct the problem. Marine Safety Investigation No. 202 (HK Law).
With the advent of fuel transition, digitalization, AI and autonomy, innovation in vessel design and operation proceeds at unprecedented speed.
Read the Magazine

Stephen Carmel & MARAD Lead the U.S. Maritime Revival Charge

The Human Perspective on the Future of Maritime Safety

Subscribe for
Maritime Reporter E-News

Maritime Reporter E-News is the maritime industry's largest circulation and most authoritative ENews Service, delivered to your Email five times per week