Marine Link
Wednesday, October 14, 2026

Austal High Speed Transport Ship Hoists Broom

Maritime Activity Reports, Inc.

August 30, 2012

USNS Spearhead: Photo credit Austal

USNS Spearhead: Photo credit Austal

Hoisting a broom is Navy tradition to signify a 'clean sweep' of trial events, now granted to JHSV 1 USNS Spearhead.

First-in-class Joint High Speed Vessel USNS Spearhead (JHSV 1), the high-speed catamaran transport ship under construction at Austal USA in Mobile, Alabama, has successfully completed Acceptance Trials (AT) in the Gulf of Mexico.

To achieve this milestone, the Navy conducted comprehensive tests which demonstrated the successful performance of the ship’s major systems and equipment to include the propulsion plant, ship handling and auxiliary systems.

Craig Perciavalle, Austal USA Senior Vice President of Operations, had this to say the day after Acceptance Trials were completed, “I consider it a major accomplishment to be authorized by the Navy to hang a broom from the mast, a Navy tradition representing a 'clean sweep' of trial events, after completing our first Acceptance Trials as prime contractor."

These trials are the last significant milestone before delivery of the ship to the Navy which is expected over the coming months. The ship was presented to the Navy’s Board of Inspection and Survey (INSURV) with high levels of completion, according to the Navy.

Austal is currently under contract with the US Navy to build nine 103-meter JHSVs under a 10-ship, $1.6 billion contract.


 

With the advent of fuel transition, digitalization, AI and autonomy, innovation in vessel design and operation proceeds at unprecedented speed.
Read the Magazine

From Data to Decisions: METIS Seeks the Intelligence Behind the Numbers

Quotable Stephen Carmel

Subscribe for
Maritime Reporter E-News

Maritime Reporter E-News is the maritime industry's largest circulation and most authoritative ENews Service, delivered to your Email five times per week